|
Applying intumescent coating to SRS 235-F Entry Hood to Cell #1 |
Applying intumescent coating to SRS 235-F Entry Hood to Cell #1
|
Category: Decontamination |
Source: Florida International University's Applied Research Center |
|
| | | |
|
|
Building 3505 After |
Management of D&D of Oak Ridge Building 3505 | After
|
Category: Dismantlement |
Source: FIU ARC |
|
| | | |
|
|
Building 3505 Before |
Management of D&D of Oak Ridge Building 3505 | Before
|
Category: Dismantlement |
Source: FIU ARC |
|
| | | |
|
|
Cleans surfaces with negligible airborne emissions |
FIU technology cleans surfaces with negligible airborne emissions, for beryllium contamination at Rocky Flats
|
Category: Decontamination |
Source: FIU |
|
| | | |
|
|
EM Crews Complete Repairs on Oak Ridge’s Tallest Stack |
The 250-foot tall 3039 stack is one of the oldest structures at Oak Ridge National Laboratory, dating back to 1949. It is located in the heart of the site and provides essential support to ongoing operations.
|
Category: Project Management |
Source: EM Update Newsletter |
|
| | | |
|
|
EM Team Takes Part in Inaugural Workshop, New Facility for Robotics, AI |
U.S. Department of Energy (DOE) Office of Environmental Management (EM) representatives recently explored technical challenges and solutions and celebrated the opening of a new facility for robotics and artificial intelligence research conducted for EM and other organizations during an inaugural workshop hosted by the Applied Research Center (ARC) at Florida International University (FIU).
|
Category: Robotics |
Source: Florida International University |
|
| | | |
|
|
EM's Carlsbad Office Sends Tool to Hanford to Boost Waste Certification Work |
Crews unload five trucks from the Carlsbad Field Office with more than 60 tons of specialized equipment for the Hanford Site’s transuranic waste program.
|
Category: Project Management |
Source: EM Update Newsletter |
|
| | | |
|
|
FIU patented pipe cleaning system |
FIU patented pipe cleaning system deployed at Big Rock Point Nuclear Power Plant
|
Category: Decontamination |
Source: FIU |
|
| | | |
|
|
Hanford Plant Brings Second Melter Online |
Workers with the Hanford Site’s Waste Treatment and Immobilization Plant inspect one of the plant’s large melters during its heatup process.
|
Category: Characterization |
Source: EM Update Newsletter |
|
| | | |
|
|
ICM Robotic Climber 0 |
ICM Robotic Climber 0
|
Category: Characterization |
Source: FIU-ARC |
|
| | | |
|
|
ICM Robotic Climber 1 |
ICM Robotic Climber -1
|
Category: Characterization |
Source: FIU ARC |
|
| | | |
|
|
ICM Robotic Climber 2 |
ICM Robotic Climber -2
|
Category: Characterization |
Source: FIU ARC |
|
| | | |
|
|
ICM Robotic Climber 3 |
ICM Robotic Climber -3
|
Category: Characterization |
Source: FIU ARC |
|
| | | |
|
|
ICM Robotic Climber 4 |
ICM Robotic Climber -4
|
Category: Characterization |
Source: FIU ARC |
|
| | | |
|
|
ICM Robotic Climber 5 |
ICM Robotic Climber -5
|
Category: Characterization |
Source: FIU ARC |
|
| | | |
|
|
K-31 Demolition |
Workers remove the transite panels from the exterior of K-31 during this May 6, 2014 picture. Related news https://www.dndkm.org/News/NewsItem.aspx?id=146&name=It+won%E2%80%99t+be+long+before+K-31+demolition+starts
|
Category: Dismantlement |
Source: epartment of Energy photograph/Lynn Freeny |
|
| | | |
|
|
Oak Ridge Completes First Phase of New Disposal Facility Project |
Work is now underway for the second phase of construction for the Environmental Management Disposal Facility. Site development continues as part of a groundwater field demonstration. https://www.dndkm.org/News/NewsItem.aspx?id=437
|
Category: Material Disposition |
Source: EM Update Newsletter |
|
| | | |
|
|
Quantumwear PPE suit in use |
This is an example of an insulator wearing the new Quantumwear protective suit in action. It is designed to fit better around the respirator, have better breathability, with reinforced knees, elbows and seams. Much cooler and less contamination chances versus launderables or single use competitive suits.
|
Category: Worker Safety |
Source: CH2 PRC website |
|
| | | |
|
|
Remote well monitoring system |
FIU remote well monitoring system deployed at Savannah River Site.
|
Category: Decontamination |
Source: FIU |
|
| | | |
|
|
Savannah River Site Team’s Creative Solution Furthers Tank Waste Retrieval |
Savannah River Site workers move an innovative grinder into place for mock-up testing before proceeding to a tank where the tool will be used to grind residual welding material inside a waste tank riser.
|
Category: Characterization |
Source: EM Update Newsletter |
|
| | | |
|
|
Strippable Coating |
Strippable Coating – Alara 1146 tested at FIU
|
Category: Decontamination |
Source: FIU ARC |
|
| | | |
|
|
Waste Isolation Pilot Plant Plans More Infrastructure Upgrades |
A view of the Waste Isolation Pilot Plant, where crews are revamping a piece of underground infrastructure vital to the U.S. Department of Energy Office of Environmental Management's vital national security and environmental cleanup missions.
|
Category: Project Management |
Source: EM Update Newsletter |
|
| | | |
|
|
West Valley Clears Large Component From Main Plant |
An operator uses a fork truck to safely remove a vent washer from the west side of the Main Plant Process Building at the West Valley Demonstration Project.
|
Category: Dismantlement |
Source: EM Update Newsletter |
|
| | | |
|
|
West Valley Ships Eight Large Legacy Waste Containers for Disposal |
Workers at the West Valley Demonstration Project use a large crane to load one of eight containers of legacy waste into an engineered overpack for safe shipment to an offsite disposal facility.
|
Category: Decontamination |
Source: EM Update Newsletter |
|
| | | |
|