Login to the D&D KM-IT.

Not a registered user? click here for U.S. registration or here for international registration.      Forgot your password? Click here

User name:   Password:   Close

Search the D&D KM-IT

Welcome Guest
Try our mobile friendly tool.

Share page:  

printer friendly logo

Search Pictures

Search D&D KM-IT's Picture Repository.

Search String:     Category:
View As: ListGrid


PreviewDetails    
Applying intumescent coating to SRS 235-F Entry Hood to Cell #1

Applying intumescent coating to SRS 235-F Entry Hood to Cell #1

Applying intumescent coating to SRS 235-F Entry Hood to Cell #1
Category: Decontamination Source: Florida International University's Applied Research Center
Management of D&D of Oak Ridge Building 3505 | After

Building 3505 After

Management of D&D of Oak Ridge Building 3505 | After
Category: Dismantlement Source: FIU ARC
Management of D&D of Oak Ridge Building 3505 | Before

Building 3505 Before

Management of D&D of Oak Ridge Building 3505 | Before
Category: Dismantlement Source: FIU ARC
FIU technology cleans surfaces with negligible airborne emissions, for beryllium contamination at Rocky Flats

Cleans surfaces with negligible airborne emissions

FIU technology cleans surfaces with negligible airborne emissions, for beryllium contamination at Rocky Flats
Category: Decontamination Source: FIU
The 250-foot tall 3039 stack is one of the oldest structures at Oak Ridge National Laboratory, dating back to 1949. It is located in the heart of the site and provides essential support to ongoing operations.

EM Crews Complete Repairs on Oak Ridge’s Tallest Stack

The 250-foot tall 3039 stack is one of the oldest structures at Oak Ridge National Laboratory, dating back to 1949. It is located in the heart of the site and provides essential support to ongoing operations.
Category: Project Management Source: EM Update Newsletter
U.S. Department of Energy (DOE) Office of Environmental Management (EM) representatives recently explored technical challenges and solutions and celebrated the opening of a new facility for robotics and artificial intelligence research conducted for EM and other organizations during an inaugural workshop hosted by the Applied Research Center (ARC) at Florida International University (FIU).

EM Team Takes Part in Inaugural Workshop, New Facility for Robotics, AI

U.S. Department of Energy (DOE) Office of Environmental Management (EM) representatives recently explored technical challenges and solutions and celebrated the opening of a new facility for robotics and artificial intelligence research conducted for EM and other organizations during an inaugural workshop hosted by the Applied Research Center (ARC) at Florida International University (FIU).
Category: Robotics Source: Florida International University
Crews unload five trucks from the Carlsbad Field Office with more than 60 tons of specialized equipment for the Hanford Site’s transuranic waste program.

EM's Carlsbad Office Sends Tool to Hanford to Boost Waste Certification Work

Crews unload five trucks from the Carlsbad Field Office with more than 60 tons of specialized equipment for the Hanford Site’s transuranic waste program.
Category: Project Management Source: EM Update Newsletter
FIU patented pipe cleaning system deployed at Big Rock Point Nuclear Power Plant

FIU patented pipe cleaning system

FIU patented pipe cleaning system deployed at Big Rock Point Nuclear Power Plant
Category: Decontamination Source: FIU
Workers with the Hanford Site’s Waste Treatment and Immobilization Plant inspect one of the plant’s large melters during its heatup process.

Hanford Plant Brings Second Melter Online

Workers with the Hanford Site’s Waste Treatment and Immobilization Plant inspect one of the plant’s large melters during its heatup process.
Category: Characterization Source: EM Update Newsletter
ICM Robotic Climber 0

ICM Robotic Climber 0

ICM Robotic Climber 0
Category: Characterization Source: FIU-ARC
ICM Robotic Climber -1

ICM Robotic Climber 1

ICM Robotic Climber -1
Category: Characterization Source: FIU ARC
ICM Robotic Climber -2

ICM Robotic Climber 2

ICM Robotic Climber -2
Category: Characterization Source: FIU ARC
ICM Robotic Climber -3

ICM Robotic Climber 3

ICM Robotic Climber -3
Category: Characterization Source: FIU ARC
ICM Robotic Climber -4

ICM Robotic Climber 4

ICM Robotic Climber -4
Category: Characterization Source: FIU ARC
ICM Robotic Climber -5

ICM Robotic Climber 5

ICM Robotic Climber -5
Category: Characterization Source: FIU ARC
Workers remove the transite panels from the exterior of K-31 during this May 6, 2014  picture. Related news https://www.dndkm.org/News/NewsItem.aspx?id=146&name=It+won%E2%80%99t+be+long+before+K-31+demolition+starts

K-31 Demolition

Workers remove the transite panels from the exterior of K-31 during this May 6, 2014 picture. Related news https://www.dndkm.org/News/NewsItem.aspx?id=146&name=It+won%E2%80%99t+be+long+before+K-31+demolition+starts
Category: Dismantlement Source: epartment of Energy photograph/Lynn Freeny
Work is now underway for the second phase of construction for the Environmental Management Disposal Facility. Site development continues as part of a groundwater field demonstration. https://www.dndkm.org/News/NewsItem.aspx?id=437

Oak Ridge Completes First Phase of New Disposal Facility Project

Work is now underway for the second phase of construction for the Environmental Management Disposal Facility. Site development continues as part of a groundwater field demonstration. https://www.dndkm.org/News/NewsItem.aspx?id=437
Category: Material Disposition Source: EM Update Newsletter
This is an example of an insulator wearing the new Quantumwear protective suit in action.  It is designed to fit better around the respirator, have better breathability, with reinforced knees, elbows and seams. Much cooler and less contamination chances versus launderables or single use competitive suits.

Quantumwear PPE suit in use

This is an example of an insulator wearing the new Quantumwear protective suit in action. It is designed to fit better around the respirator, have better breathability, with reinforced knees, elbows and seams. Much cooler and less contamination chances versus launderables or single use competitive suits.
Category: Worker Safety Source: CH2 PRC website
FIU remote well monitoring system deployed at Savannah River Site.

Remote well monitoring system

FIU remote well monitoring system deployed at Savannah River Site.
Category: Decontamination Source: FIU
Savannah River Site workers move an innovative grinder into place for mock-up testing before proceeding to a tank where the tool will be used to grind residual welding material inside a waste tank riser.

Savannah River Site Team’s Creative Solution Furthers Tank Waste Retrieval

Savannah River Site workers move an innovative grinder into place for mock-up testing before proceeding to a tank where the tool will be used to grind residual welding material inside a waste tank riser.
Category: Characterization Source: EM Update Newsletter
Strippable Coating – Alara 1146 tested at FIU

Strippable Coating

Strippable Coating – Alara 1146 tested at FIU
Category: Decontamination Source: FIU ARC
A view of the Waste Isolation Pilot Plant, where crews are revamping a piece of underground infrastructure vital to the U.S. Department of Energy Office of Environmental Management's vital national security and environmental cleanup missions.

Waste Isolation Pilot Plant Plans More Infrastructure Upgrades

A view of the Waste Isolation Pilot Plant, where crews are revamping a piece of underground infrastructure vital to the U.S. Department of Energy Office of Environmental Management's vital national security and environmental cleanup missions.
Category: Project Management Source: EM Update Newsletter
An operator uses a fork truck to safely remove a vent washer from the west side of the Main Plant Process Building at the West Valley Demonstration Project.

West Valley Clears Large Component From Main Plant

An operator uses a fork truck to safely remove a vent washer from the west side of the Main Plant Process Building at the West Valley Demonstration Project.
Category: Dismantlement Source: EM Update Newsletter
Workers at the West Valley Demonstration Project use a large crane to load one of eight containers of legacy waste into an engineered overpack for safe shipment to an offsite disposal facility.

West Valley Ships Eight Large Legacy Waste Containers for Disposal

Workers at the West Valley Demonstration Project use a large crane to load one of eight containers of legacy waste into an engineered overpack for safe shipment to an offsite disposal facility.
Category: Decontamination Source: EM Update Newsletter
 
Back to Top
More Modules

Download Original    Management of D&D of Oak Ridge Building 3505 | After

Pre cache